{"id":19263,"date":"2025-12-19T14:52:50","date_gmt":"2025-12-19T06:52:50","guid":{"rendered":"https:\/\/3d-universal.com\/en\/?p=19263"},"modified":"2025-12-19T14:56:38","modified_gmt":"2025-12-19T06:56:38","slug":"numerical-ability-work-problems-explained","status":"publish","type":"post","link":"https:\/\/3d-universal.com\/en\/blogs\/numerical-ability-work-problems-explained.html","title":{"rendered":"Numerical Ability Work Problems Explained: Civil Service Exam Guide"},"content":{"rendered":"<p><!--more--><\/p>\n<h1 data-start=\"0\" data-end=\"69\">Numerical Ability Work Problems Explained: Civil Service Exam Guide<\/h1>\n<p data-start=\"71\" data-end=\"395\">Numerical Ability is a core component of the Civil Service Exam, and <strong data-start=\"140\" data-end=\"157\">work problems<\/strong> are among the most frequently tested and most confusing question types. These problems appear simple on the surface, but many examinees lose points due to poor understanding of concepts like work rate, time relationships, and efficiency.<\/p>\n<p data-start=\"397\" data-end=\"675\">This guide explains <strong data-start=\"417\" data-end=\"447\">work problems step by step<\/strong>, from basic concepts to advanced variations, using clear logic rather than shortcuts that are easy to forget under exam pressure. By the end of this article, you should be able to solve work problems accurately and confidently.<\/p>\n<hr data-start=\"677\" data-end=\"680\" \/>\n<h2 data-start=\"682\" data-end=\"738\">Understanding Work Problems in the Civil Service Exam<\/h2>\n<p data-start=\"740\" data-end=\"969\">Work problems generally involve people, machines, or groups completing a task over time. The goal is to determine <strong data-start=\"854\" data-end=\"881\">how long the work takes<\/strong>, <strong data-start=\"883\" data-end=\"914\">how many workers are needed<\/strong>, or <strong data-start=\"919\" data-end=\"944\">how much work is done<\/strong> within a certain period.<\/p>\n<p data-start=\"971\" data-end=\"996\">Typical keywords include:<\/p>\n<ul data-start=\"997\" data-end=\"1099\">\n<li data-start=\"997\" data-end=\"1015\">\n<p data-start=\"999\" data-end=\"1015\"><em data-start=\"999\" data-end=\"1015\">complete a job<\/em><\/p>\n<\/li>\n<li data-start=\"1016\" data-end=\"1035\">\n<p data-start=\"1018\" data-end=\"1035\"><em data-start=\"1018\" data-end=\"1035\">finish the work<\/em><\/p>\n<\/li>\n<li data-start=\"1036\" data-end=\"1056\">\n<p data-start=\"1038\" data-end=\"1056\"><em data-start=\"1038\" data-end=\"1056\">working together<\/em><\/p>\n<\/li>\n<li data-start=\"1057\" data-end=\"1079\">\n<p data-start=\"1059\" data-end=\"1079\"><em data-start=\"1059\" data-end=\"1079\">per day \/ per hour<\/em><\/p>\n<\/li>\n<li data-start=\"1080\" data-end=\"1099\">\n<p data-start=\"1082\" data-end=\"1099\"><em data-start=\"1082\" data-end=\"1099\">faster \/ slower<\/em><\/p>\n<\/li>\n<\/ul>\n<p data-start=\"1101\" data-end=\"1137\">These problems test your ability to:<\/p>\n<ul data-start=\"1138\" data-end=\"1233\">\n<li data-start=\"1138\" data-end=\"1167\">\n<p data-start=\"1140\" data-end=\"1167\">Interpret rates correctly<\/p>\n<\/li>\n<li data-start=\"1168\" data-end=\"1198\">\n<p data-start=\"1170\" data-end=\"1198\">Set up equations logically<\/p>\n<\/li>\n<li data-start=\"1199\" data-end=\"1233\">\n<p data-start=\"1201\" data-end=\"1233\">Avoid common calculation traps<\/p>\n<\/li>\n<\/ul>\n<hr data-start=\"1235\" data-end=\"1238\" \/>\n<h2 data-start=\"1240\" data-end=\"1281\">The Core Concept: Work, Rate, and Time<\/h2>\n<p data-start=\"1283\" data-end=\"1342\">At the heart of all work problems is a simple relationship:<\/p>\n<p data-start=\"1344\" data-end=\"1366\"><strong data-start=\"1344\" data-end=\"1366\">Work = Rate \u00d7 Time<\/strong><\/p>\n<p data-start=\"1368\" data-end=\"1374\">Where:<\/p>\n<ul data-start=\"1375\" data-end=\"1532\">\n<li data-start=\"1375\" data-end=\"1434\">\n<p data-start=\"1377\" data-end=\"1434\"><strong data-start=\"1377\" data-end=\"1385\">Work<\/strong> is the total task (often treated as 1 whole job)<\/p>\n<\/li>\n<li data-start=\"1435\" data-end=\"1494\">\n<p data-start=\"1437\" data-end=\"1494\"><strong data-start=\"1437\" data-end=\"1445\">Rate<\/strong> is the amount of work completed per unit of time<\/p>\n<\/li>\n<li data-start=\"1495\" data-end=\"1532\">\n<p data-start=\"1497\" data-end=\"1532\"><strong data-start=\"1497\" data-end=\"1505\">Time<\/strong> is how long the work takes<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"1534\" data-end=\"1590\">If one person completes a job in 10 days, their rate is:<\/p>\n<p data-start=\"1592\" data-end=\"1630\"><strong data-start=\"1592\" data-end=\"1630\">1 job \u00f7 10 days = 1\/10 job per day<\/strong><\/p>\n<p data-start=\"1632\" data-end=\"1703\">Understanding this idea is far more important than memorizing formulas.<\/p>\n<hr data-start=\"1705\" data-end=\"1708\" \/>\n<h2 data-start=\"1710\" data-end=\"1740\">Single Worker Work Problems<\/h2>\n<p data-start=\"1742\" data-end=\"1848\">These are the simplest form of work problems and often serve as the foundation for more complex questions.<\/p>\n<h3 data-start=\"1850\" data-end=\"1863\">Example 1<\/h3>\n<p data-start=\"1864\" data-end=\"1951\">A worker can complete a job in 8 days. How much work does the worker complete in 1 day?<\/p>\n<p data-start=\"1953\" data-end=\"1965\"><strong data-start=\"1953\" data-end=\"1965\">Solution<\/strong><\/p>\n<ul data-start=\"1966\" data-end=\"2039\">\n<li data-start=\"1966\" data-end=\"1986\">\n<p data-start=\"1968\" data-end=\"1986\">Total work = 1 job<\/p>\n<\/li>\n<li data-start=\"1987\" data-end=\"2002\">\n<p data-start=\"1989\" data-end=\"2002\">Time = 8 days<\/p>\n<\/li>\n<li data-start=\"2003\" data-end=\"2039\">\n<p data-start=\"2005\" data-end=\"2039\">Rate = 1 \u00f7 8 = <strong data-start=\"2020\" data-end=\"2039\">1\/8 job per day<\/strong><\/p>\n<\/li>\n<\/ul>\n<p data-start=\"2041\" data-end=\"2109\">This concept becomes critical when combining multiple workers later.<\/p>\n<hr data-start=\"2111\" data-end=\"2114\" \/>\n<h2 data-start=\"2116\" data-end=\"2152\">Multiple Workers Working Together<\/h2>\n<p data-start=\"2154\" data-end=\"2222\">When workers work together, <strong data-start=\"2182\" data-end=\"2204\">their rates add up<\/strong>, not their times.<\/p>\n<h3 data-start=\"2224\" data-end=\"2237\">Example 2<\/h3>\n<p data-start=\"2238\" data-end=\"2370\">Worker A can finish a job in 6 days.<br data-start=\"2274\" data-end=\"2277\" \/>Worker B can finish the same job in 12 days.<br data-start=\"2321\" data-end=\"2324\" \/>How long will they take if they work together?<\/p>\n<p data-start=\"2372\" data-end=\"2406\"><strong data-start=\"2372\" data-end=\"2406\">Step 1: Convert time into rate<\/strong><\/p>\n<ul data-start=\"2407\" data-end=\"2475\">\n<li data-start=\"2407\" data-end=\"2440\">\n<p data-start=\"2409\" data-end=\"2440\">Worker A rate = 1\/6 job per day<\/p>\n<\/li>\n<li data-start=\"2441\" data-end=\"2475\">\n<p data-start=\"2443\" data-end=\"2475\">Worker B rate = 1\/12 job per day<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"2477\" data-end=\"2498\"><strong data-start=\"2477\" data-end=\"2498\">Step 2: Add rates<\/strong><\/p>\n<ul data-start=\"2499\" data-end=\"2620\">\n<li data-start=\"2499\" data-end=\"2527\">\n<p data-start=\"2501\" data-end=\"2527\">Combined rate = 1\/6 + 1\/12<\/p>\n<\/li>\n<li data-start=\"2528\" data-end=\"2565\">\n<p data-start=\"2530\" data-end=\"2565\">Find common denominator: 1\/6 = 2\/12<\/p>\n<\/li>\n<li data-start=\"2566\" data-end=\"2620\">\n<p data-start=\"2568\" data-end=\"2620\">Combined rate = 2\/12 + 1\/12 = 3\/12 = 1\/4 job per day<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"2622\" data-end=\"2643\"><strong data-start=\"2622\" data-end=\"2643\">Step 3: Find time<\/strong><\/p>\n<ul data-start=\"2644\" data-end=\"2675\">\n<li data-start=\"2644\" data-end=\"2675\">\n<p data-start=\"2646\" data-end=\"2675\">Time = 1 \u00f7 (1\/4) = <strong data-start=\"2665\" data-end=\"2675\">4 days<\/strong><\/p>\n<\/li>\n<\/ul>\n<hr data-start=\"2677\" data-end=\"2680\" \/>\n<h2 data-start=\"2682\" data-end=\"2729\">Common Mistake: Adding Time Instead of Rates<\/h2>\n<p data-start=\"2731\" data-end=\"2765\">Many examinees mistakenly do this:<\/p>\n<p data-start=\"2767\" data-end=\"2795\">6 days + 12 days = 18 days &#x274c;<\/p>\n<p data-start=\"2797\" data-end=\"2878\">This is incorrect because time does not combine linearly. <strong data-start=\"2855\" data-end=\"2878\">Only rates combine.<\/strong><\/p>\n<p data-start=\"2880\" data-end=\"2889\">Remember:<\/p>\n<ul data-start=\"2890\" data-end=\"2941\">\n<li data-start=\"2890\" data-end=\"2910\">\n<p data-start=\"2892\" data-end=\"2910\"><strong data-start=\"2892\" data-end=\"2910\">Work rates add<\/strong><\/p>\n<\/li>\n<li data-start=\"2911\" data-end=\"2941\">\n<p data-start=\"2913\" data-end=\"2941\"><strong data-start=\"2913\" data-end=\"2941\">Time never adds directly<\/strong><\/p>\n<\/li>\n<\/ul>\n<hr data-start=\"2943\" data-end=\"2946\" \/>\n<h2 data-start=\"2948\" data-end=\"2983\">Different Work Efficiency Levels<\/h2>\n<p data-start=\"2985\" data-end=\"3062\">Not all workers are equally efficient. Some complete work faster than others.<\/p>\n<h3 data-start=\"3064\" data-end=\"3077\">Example 3<\/h3>\n<p data-start=\"3078\" data-end=\"3187\">A can do a job in 10 days, while B is twice as efficient as A. How long will B take to complete the same job?<\/p>\n<p data-start=\"3189\" data-end=\"3201\"><strong data-start=\"3189\" data-end=\"3201\">Solution<\/strong><\/p>\n<ul data-start=\"3202\" data-end=\"3325\">\n<li data-start=\"3202\" data-end=\"3253\">\n<p data-start=\"3204\" data-end=\"3253\">If B is twice as efficient, B works twice as fast<\/p>\n<\/li>\n<li data-start=\"3254\" data-end=\"3283\">\n<p data-start=\"3256\" data-end=\"3283\">A\u2019s rate = 1\/10 job per day<\/p>\n<\/li>\n<li data-start=\"3284\" data-end=\"3325\">\n<p data-start=\"3286\" data-end=\"3325\">B\u2019s rate = 2 \u00d7 (1\/10) = 1\/5 job per day<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"3327\" data-end=\"3341\"><strong data-start=\"3327\" data-end=\"3341\">Time for B<\/strong><\/p>\n<ul data-start=\"3342\" data-end=\"3373\">\n<li data-start=\"3342\" data-end=\"3373\">\n<p data-start=\"3344\" data-end=\"3373\">Time = 1 \u00f7 (1\/5) = <strong data-start=\"3363\" data-end=\"3373\">5 days<\/strong><\/p>\n<\/li>\n<\/ul>\n<p data-start=\"3375\" data-end=\"3435\">Efficiency comparisons are common in the Civil Service Exam.<\/p>\n<hr data-start=\"3437\" data-end=\"3440\" \/>\n<h2 data-start=\"3442\" data-end=\"3481\">Work Problems Involving Partial Work<\/h2>\n<p data-start=\"3483\" data-end=\"3541\">Sometimes a worker starts a job, then another finishes it.<\/p>\n<h3 data-start=\"3543\" data-end=\"3556\">Example 4<\/h3>\n<p data-start=\"3557\" data-end=\"3701\">A can complete a job in 12 days. A works for 4 days, then B completes the rest in 6 days. How long would B take to complete the whole job alone?<\/p>\n<p data-start=\"3703\" data-end=\"3729\"><strong data-start=\"3703\" data-end=\"3729\">Step 1: Work done by A<\/strong><\/p>\n<ul data-start=\"3730\" data-end=\"3788\">\n<li data-start=\"3730\" data-end=\"3747\">\n<p data-start=\"3732\" data-end=\"3747\">A\u2019s rate = 1\/12<\/p>\n<\/li>\n<li data-start=\"3748\" data-end=\"3788\">\n<p data-start=\"3750\" data-end=\"3788\">Work done in 4 days = 4 \u00d7 (1\/12) = 1\/3<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"3790\" data-end=\"3816\"><strong data-start=\"3790\" data-end=\"3816\">Step 2: Remaining work<\/strong><\/p>\n<ul data-start=\"3817\" data-end=\"3849\">\n<li data-start=\"3817\" data-end=\"3849\">\n<p data-start=\"3819\" data-end=\"3849\">Remaining work = 1 \u2212 1\/3 = 2\/3<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"3851\" data-end=\"3871\"><strong data-start=\"3851\" data-end=\"3871\">Step 3: B\u2019s rate<\/strong><\/p>\n<ul data-start=\"3872\" data-end=\"3951\">\n<li data-start=\"3872\" data-end=\"3903\">\n<p data-start=\"3874\" data-end=\"3903\">B finishes 2\/3 work in 6 days<\/p>\n<\/li>\n<li data-start=\"3904\" data-end=\"3951\">\n<p data-start=\"3906\" data-end=\"3951\">B\u2019s rate = (2\/3) \u00f7 6 = 2\/18 = 1\/9 job per day<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"3953\" data-end=\"3981\"><strong data-start=\"3953\" data-end=\"3981\">Step 4: Time for B alone<\/strong><\/p>\n<ul data-start=\"3982\" data-end=\"4013\">\n<li data-start=\"3982\" data-end=\"4013\">\n<p data-start=\"3984\" data-end=\"4013\">Time = 1 \u00f7 (1\/9) = <strong data-start=\"4003\" data-end=\"4013\">9 days<\/strong><\/p>\n<\/li>\n<\/ul>\n<hr data-start=\"4015\" data-end=\"4018\" \/>\n<h2 data-start=\"4020\" data-end=\"4058\">Pipes and Cisterns (Work with Loss)<\/h2>\n<p data-start=\"4060\" data-end=\"4151\">These problems involve <strong data-start=\"4083\" data-end=\"4107\">filling and emptying<\/strong>, which is still a work problem at its core.<\/p>\n<h3 data-start=\"4153\" data-end=\"4166\">Example 5<\/h3>\n<p data-start=\"4167\" data-end=\"4316\">A pipe fills a tank in 8 hours, while another pipe empties it in 12 hours. If both pipes are opened together, how long will it take to fill the tank?<\/p>\n<p data-start=\"4318\" data-end=\"4335\"><strong data-start=\"4318\" data-end=\"4335\">Step 1: Rates<\/strong><\/p>\n<ul data-start=\"4336\" data-end=\"4408\">\n<li data-start=\"4336\" data-end=\"4370\">\n<p data-start=\"4338\" data-end=\"4370\">Filling rate = 1\/8 tank per hour<\/p>\n<\/li>\n<li data-start=\"4371\" data-end=\"4408\">\n<p data-start=\"4373\" data-end=\"4408\">Emptying rate = \u22121\/12 tank per hour<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"4410\" data-end=\"4430\"><strong data-start=\"4410\" data-end=\"4430\">Step 2: Net rate<\/strong><\/p>\n<ul data-start=\"4431\" data-end=\"4512\">\n<li data-start=\"4431\" data-end=\"4454\">\n<p data-start=\"4433\" data-end=\"4454\">Net rate = 1\/8 \u2212 1\/12<\/p>\n<\/li>\n<li data-start=\"4455\" data-end=\"4480\">\n<p data-start=\"4457\" data-end=\"4480\">Common denominator = 24<\/p>\n<\/li>\n<li data-start=\"4481\" data-end=\"4512\">\n<p data-start=\"4483\" data-end=\"4512\">Net rate = 3\/24 \u2212 2\/24 = 1\/24<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"4514\" data-end=\"4530\"><strong data-start=\"4514\" data-end=\"4530\">Step 3: Time<\/strong><\/p>\n<ul data-start=\"4531\" data-end=\"4565\">\n<li data-start=\"4531\" data-end=\"4565\">\n<p data-start=\"4533\" data-end=\"4565\">Time = 1 \u00f7 (1\/24) = <strong data-start=\"4553\" data-end=\"4565\">24 hours<\/strong><\/p>\n<\/li>\n<\/ul>\n<hr data-start=\"4567\" data-end=\"4570\" \/>\n<h2 data-start=\"4572\" data-end=\"4618\">Work Problems with Men, Women, and Children<\/h2>\n<p data-start=\"4620\" data-end=\"4663\">Sometimes work capacity is given in ratios.<\/p>\n<h3 data-start=\"4665\" data-end=\"4678\">Example 6<\/h3>\n<p data-start=\"4679\" data-end=\"4797\">3 men can do the same work as 5 women. If 6 men work for 4 days, how many days will 10 women take to do the same work?<\/p>\n<p data-start=\"4799\" data-end=\"4832\"><strong data-start=\"4799\" data-end=\"4832\">Step 1: Establish equivalence<\/strong><\/p>\n<ul data-start=\"4833\" data-end=\"4870\">\n<li data-start=\"4833\" data-end=\"4850\">\n<p data-start=\"4835\" data-end=\"4850\">3 men = 5 women<\/p>\n<\/li>\n<li data-start=\"4851\" data-end=\"4870\">\n<p data-start=\"4853\" data-end=\"4870\">1 man = 5\/3 women<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"4872\" data-end=\"4896\"><strong data-start=\"4872\" data-end=\"4896\">Step 2: Convert work<\/strong><\/p>\n<ul data-start=\"4897\" data-end=\"4927\">\n<li data-start=\"4897\" data-end=\"4927\">\n<p data-start=\"4899\" data-end=\"4927\">6 men = 6 \u00d7 (5\/3) = 10 women<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"4929\" data-end=\"4953\"><strong data-start=\"4929\" data-end=\"4953\">Step 3: Compare time<\/strong><\/p>\n<ul data-start=\"4954\" data-end=\"5027\">\n<li data-start=\"4954\" data-end=\"4998\">\n<p data-start=\"4956\" data-end=\"4998\">Same number of workers doing the same work<\/p>\n<\/li>\n<li data-start=\"4999\" data-end=\"5027\">\n<p data-start=\"5001\" data-end=\"5027\">Time required = <strong data-start=\"5017\" data-end=\"5027\">4 days<\/strong><\/p>\n<\/li>\n<\/ul>\n<hr data-start=\"5029\" data-end=\"5032\" \/>\n<h2 data-start=\"5034\" data-end=\"5060\">Work and Wages Problems<\/h2>\n<p data-start=\"5062\" data-end=\"5119\">These questions combine work rates with proportional pay.<\/p>\n<h3 data-start=\"5121\" data-end=\"5134\">Example 7<\/h3>\n<p data-start=\"5135\" data-end=\"5295\">A and B work together for 10 days and earn \u20b14,000. A alone can complete the job in 20 days, while B alone can complete it in 30 days. How much should A receive?<\/p>\n<p data-start=\"5297\" data-end=\"5314\"><strong data-start=\"5297\" data-end=\"5314\">Step 1: Rates<\/strong><\/p>\n<ul data-start=\"5315\" data-end=\"5350\">\n<li data-start=\"5315\" data-end=\"5332\">\n<p data-start=\"5317\" data-end=\"5332\">A\u2019s rate = 1\/20<\/p>\n<\/li>\n<li data-start=\"5333\" data-end=\"5350\">\n<p data-start=\"5335\" data-end=\"5350\">B\u2019s rate = 1\/30<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"5352\" data-end=\"5377\"><strong data-start=\"5352\" data-end=\"5377\">Step 2: Ratio of work<\/strong><\/p>\n<ul data-start=\"5378\" data-end=\"5428\">\n<li data-start=\"5378\" data-end=\"5403\">\n<p data-start=\"5380\" data-end=\"5403\">A : B = (1\/20) : (1\/30)<\/p>\n<\/li>\n<li data-start=\"5404\" data-end=\"5428\">\n<p data-start=\"5406\" data-end=\"5428\">Multiply by 60 \u2192 3 : 2<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"5430\" data-end=\"5454\"><strong data-start=\"5430\" data-end=\"5454\">Step 3: Divide wages<\/strong><\/p>\n<ul data-start=\"5455\" data-end=\"5545\">\n<li data-start=\"5455\" data-end=\"5471\">\n<p data-start=\"5457\" data-end=\"5471\">Total = \u20b14,000<\/p>\n<\/li>\n<li data-start=\"5472\" data-end=\"5510\">\n<p data-start=\"5474\" data-end=\"5510\">A\u2019s share = 3\/5 \u00d7 4,000 = <strong data-start=\"5500\" data-end=\"5510\">\u20b12,400<\/strong><\/p>\n<\/li>\n<li data-start=\"5511\" data-end=\"5545\">\n<p data-start=\"5513\" data-end=\"5545\">B\u2019s share = 2\/5 \u00d7 4,000 = \u20b11,600<\/p>\n<\/li>\n<\/ul>\n<hr data-start=\"5547\" data-end=\"5550\" \/>\n<h2 data-start=\"5552\" data-end=\"5599\">Shortcut Method Using LCM (When Appropriate)<\/h2>\n<p data-start=\"5601\" data-end=\"5683\">For some problems, especially under time pressure, you can use the <strong data-start=\"5668\" data-end=\"5682\">LCM method<\/strong>.<\/p>\n<h3 data-start=\"5685\" data-end=\"5698\">Example 8<\/h3>\n<p data-start=\"5699\" data-end=\"5758\">A finishes a job in 4 days, B in 6 days. How long together?<\/p>\n<p data-start=\"5760\" data-end=\"5791\"><strong data-start=\"5760\" data-end=\"5791\">Step 1: LCM of 4 and 6 = 12<\/strong><\/p>\n<ul data-start=\"5792\" data-end=\"5863\">\n<li data-start=\"5792\" data-end=\"5827\">\n<p data-start=\"5794\" data-end=\"5827\">A\u2019s work per day = 12\/4 = 3 units<\/p>\n<\/li>\n<li data-start=\"5828\" data-end=\"5863\">\n<p data-start=\"5830\" data-end=\"5863\">B\u2019s work per day = 12\/6 = 2 units<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"5865\" data-end=\"5890\"><strong data-start=\"5865\" data-end=\"5890\">Step 2: Combined work<\/strong><\/p>\n<ul data-start=\"5891\" data-end=\"5924\">\n<li data-start=\"5891\" data-end=\"5924\">\n<p data-start=\"5893\" data-end=\"5924\">Total per day = 3 + 2 = 5 units<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"5926\" data-end=\"5942\"><strong data-start=\"5926\" data-end=\"5942\">Step 3: Time<\/strong><\/p>\n<ul data-start=\"5943\" data-end=\"5973\">\n<li data-start=\"5943\" data-end=\"5973\">\n<p data-start=\"5945\" data-end=\"5973\">Time = 12 \u00f7 5 = <strong data-start=\"5961\" data-end=\"5973\">2.4 days<\/strong><\/p>\n<\/li>\n<\/ul>\n<p data-start=\"5975\" data-end=\"6027\">Use this method only if you are comfortable with it.<\/p>\n<hr data-start=\"6029\" data-end=\"6032\" \/>\n<h2 data-start=\"6034\" data-end=\"6085\">Common Traps in Civil Service Exam Work Problems<\/h2>\n<p data-start=\"6087\" data-end=\"6117\">Avoid these frequent mistakes:<\/p>\n<ul data-start=\"6118\" data-end=\"6321\">\n<li data-start=\"6118\" data-end=\"6148\">\n<p data-start=\"6120\" data-end=\"6148\">Adding time instead of rates<\/p>\n<\/li>\n<li data-start=\"6149\" data-end=\"6188\">\n<p data-start=\"6151\" data-end=\"6188\">Forgetting to subtract emptying rates<\/p>\n<\/li>\n<li data-start=\"6189\" data-end=\"6240\">\n<p data-start=\"6191\" data-end=\"6240\">Misreading \u201ctwice as efficient\u201d as twice the time<\/p>\n<\/li>\n<li data-start=\"6241\" data-end=\"6282\">\n<p data-start=\"6243\" data-end=\"6282\">Ignoring partial work already completed<\/p>\n<\/li>\n<li data-start=\"6283\" data-end=\"6321\">\n<p data-start=\"6285\" data-end=\"6321\">Rushing without setting up equations<\/p>\n<\/li>\n<\/ul>\n<hr data-start=\"6323\" data-end=\"6326\" \/>\n<h2 data-start=\"6328\" data-end=\"6373\">Exam Tips for Solving Work Problems Faster<\/h2>\n<ul data-start=\"6375\" data-end=\"6592\">\n<li data-start=\"6375\" data-end=\"6414\">\n<p data-start=\"6377\" data-end=\"6414\">Always convert time to <strong data-start=\"6400\" data-end=\"6414\">rate first<\/strong><\/p>\n<\/li>\n<li data-start=\"6415\" data-end=\"6470\">\n<p data-start=\"6417\" data-end=\"6470\">Treat total work as <strong data-start=\"6437\" data-end=\"6446\">1 job<\/strong> unless stated otherwise<\/p>\n<\/li>\n<li data-start=\"6471\" data-end=\"6511\">\n<p data-start=\"6473\" data-end=\"6511\">Write rates clearly before calculating<\/p>\n<\/li>\n<li data-start=\"6512\" data-end=\"6548\">\n<p data-start=\"6514\" data-end=\"6548\">Estimate answers to catch mistakes<\/p>\n<\/li>\n<li data-start=\"6549\" data-end=\"6592\">\n<p data-start=\"6551\" data-end=\"6592\">Practice regularly under timed conditions<\/p>\n<\/li>\n<\/ul>\n<hr data-start=\"6594\" data-end=\"6597\" \/>\n<h2 data-start=\"6599\" data-end=\"6616\">Final Thoughts<\/h2>\n<p data-start=\"6618\" data-end=\"6834\">Work problems are not about complex mathematics; they are about <strong data-start=\"6682\" data-end=\"6717\">clear thinking and proper setup<\/strong>. Once you master the relationship between work, rate, and time, even the hardest-looking problems become manageable.<\/p>\n<p data-start=\"6836\" data-end=\"7001\" data-is-last-node=\"\" data-is-only-node=\"\">In the Civil Service Exam, accuracy matters more than speed. Build a strong foundation, practice systematically, and approach each problem with confidence and logic.<\/p>\n<h2 data-start=\"0\" data-end=\"32\">Problem Sets With Answer Keys<\/h2>\n<h2 data-start=\"34\" data-end=\"71\">Problem Set 1: Basics of Work Rate<\/h2>\n<ol data-start=\"73\" data-end=\"818\">\n<li data-start=\"73\" data-end=\"191\">\n<p data-start=\"76\" data-end=\"191\">A can finish a job in 15 days. What fraction of the work does A complete in 1 day?<br data-start=\"158\" data-end=\"161\" \/><strong data-start=\"161\" data-end=\"172\">Answer:<\/strong> <span class=\"katex\"><span class=\"katex-mathml\">115\\frac{1}{15}<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">15<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">1<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<\/li>\n<li data-start=\"193\" data-end=\"323\">\n<p data-start=\"196\" data-end=\"323\">A can finish a job in 18 days. How much work will A complete in 6 days?<br data-start=\"267\" data-end=\"270\" \/><strong data-start=\"270\" data-end=\"281\">Answer:<\/strong> <span class=\"katex\"><span class=\"katex-mathml\">6\u00d7118=136 \\times \\frac{1}{18} = \\frac{1}{3}<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mord\">6<\/span><span class=\"mbin\">\u00d7<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">18<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">1<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">3<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">1<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<\/li>\n<li data-start=\"325\" data-end=\"469\">\n<p data-start=\"328\" data-end=\"469\">A finishes a job in 20 days. How long will A take to finish <span class=\"katex\"><span class=\"katex-mathml\">35\\frac{3}{5}<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">5<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">3<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span> of the job?<br data-start=\"417\" data-end=\"420\" \/><strong data-start=\"420\" data-end=\"431\">Answer:<\/strong> <span class=\"katex\"><span class=\"katex-mathml\">35\u00d720=12\\frac{3}{5} \\times 20 = 12<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">5<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">3<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><span class=\"mbin\">\u00d7<\/span><\/span><span class=\"base\"><span class=\"mord\">20<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">12<\/span><\/span><\/span><\/span> days<\/p>\n<\/li>\n<li data-start=\"471\" data-end=\"643\">\n<p data-start=\"474\" data-end=\"643\">A does <span class=\"katex\"><span class=\"katex-mathml\">29\\frac{2}{9}<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">9<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">2<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span> of a job in 4 days. How long will A take to finish the whole job?<br data-start=\"564\" data-end=\"567\" \/><strong data-start=\"567\" data-end=\"578\">Answer:<\/strong> Rate <span class=\"katex\"><span class=\"katex-mathml\">=2\/94=118=\\frac{2\/9}{4}=\\frac{1}{18}<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">4<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">2\/9<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">18<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">1<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span> job\/day \u21d2 Time <span class=\"katex\"><span class=\"katex-mathml\">=18=18<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">18<\/span><\/span><\/span><\/span> days<\/p>\n<\/li>\n<li data-start=\"645\" data-end=\"818\">\n<p data-start=\"648\" data-end=\"818\">A can complete a job in 24 days. B can complete the same job in 32 days. Who is faster and by how many days (working alone)?<br data-start=\"772\" data-end=\"775\" \/><strong data-start=\"775\" data-end=\"786\">Answer:<\/strong> A is faster by <span class=\"katex\"><span class=\"katex-mathml\">32\u221224=832-24=8<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mord\">32<\/span><span class=\"mbin\">\u2212<\/span><\/span><span class=\"base\"><span class=\"mord\">24<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">8<\/span><\/span><\/span><\/span> days<\/p>\n<\/li>\n<\/ol>\n<hr data-start=\"820\" data-end=\"823\" \/>\n<h2 data-start=\"825\" data-end=\"859\">Problem Set 2: Working Together<\/h2>\n<ol start=\"6\" data-start=\"861\" data-end=\"2159\">\n<li data-start=\"861\" data-end=\"1054\">\n<p data-start=\"864\" data-end=\"1054\">A can finish a job in 8 days and B can finish it in 12 days. How long will they take together?<br data-start=\"958\" data-end=\"961\" \/><strong data-start=\"961\" data-end=\"972\">Answer:<\/strong> Rate <span class=\"katex\"><span class=\"katex-mathml\">=18+112=524=\\frac{1}{8}+\\frac{1}{12}=\\frac{5}{24}<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">8<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">1<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><span class=\"mbin\">+<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">12<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">1<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">24<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">5<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span> \u21d2 Time <span class=\"katex\"><span class=\"katex-mathml\">=245=4.8=\\frac{24}{5}=4.8<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">5<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">24<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">4.8<\/span><\/span><\/span><\/span> days<\/p>\n<\/li>\n<li data-start=\"1056\" data-end=\"1218\">\n<p data-start=\"1059\" data-end=\"1218\">A can finish a job in 9 days and B can finish it in 18 days. How long together?<br data-start=\"1138\" data-end=\"1141\" \/><strong data-start=\"1141\" data-end=\"1152\">Answer:<\/strong> Rate <span class=\"katex\"><span class=\"katex-mathml\">=19+118=16=\\frac{1}{9}+\\frac{1}{18}=\\frac{1}{6}<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">9<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">1<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><span class=\"mbin\">+<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">18<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">1<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">6<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">1<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span> \u21d2 Time <span class=\"katex\"><span class=\"katex-mathml\">=6=6<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">6<\/span><\/span><\/span><\/span> days<\/p>\n<\/li>\n<li data-start=\"1220\" data-end=\"1470\">\n<p data-start=\"1223\" data-end=\"1470\">A and B together finish a job in 10 days. A alone can do it in 15 days. How long can B alone do it?<br data-start=\"1322\" data-end=\"1325\" \/><strong data-start=\"1325\" data-end=\"1336\">Answer:<\/strong> Together rate <span class=\"katex\"><span class=\"katex-mathml\">=110=\\frac{1}{10}<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">10<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">1<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span>. A rate <span class=\"katex\"><span class=\"katex-mathml\">=115=\\frac{1}{15}<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">15<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">1<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span>.<br data-start=\"1395\" data-end=\"1398\" \/>B rate <span class=\"katex\"><span class=\"katex-mathml\">=110\u2212115=130=\\frac{1}{10}-\\frac{1}{15}=\\frac{1}{30}<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">10<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">1<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><span class=\"mbin\">\u2212<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">15<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">1<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">30<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">1<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span> \u21d2 B time <span class=\"katex\"><span class=\"katex-mathml\">=30=30<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">30<\/span><\/span><\/span><\/span> days<\/p>\n<\/li>\n<li data-start=\"1472\" data-end=\"1707\">\n<p data-start=\"1475\" data-end=\"1707\">A can do a job in 6 days, B in 8 days, and C in 12 days. How long if all work together?<br data-start=\"1562\" data-end=\"1565\" \/><strong data-start=\"1565\" data-end=\"1576\">Answer:<\/strong> Rate <span class=\"katex\"><span class=\"katex-mathml\">=16+18+112=4+3+224=924=38=\\frac{1}{6}+\\frac{1}{8}+\\frac{1}{12}=\\frac{4+3+2}{24}=\\frac{9}{24}=\\frac{3}{8}<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">6<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">1<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><span class=\"mbin\">+<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">8<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">1<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><span class=\"mbin\">+<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">12<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">1<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">24<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">4<span class=\"mbin mtight\">+<\/span>3<span class=\"mbin mtight\">+<\/span>2<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">24<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">9<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">8<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">3<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><br data-start=\"1665\" data-end=\"1668\" \/>Time <span class=\"katex\"><span class=\"katex-mathml\">=83=223=\\frac{8}{3}=2\\frac{2}{3}<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">3<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">8<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">2<\/span><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">3<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">2<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span> days<\/p>\n<\/li>\n<li data-start=\"1709\" data-end=\"2159\">\n<p data-start=\"1713\" data-end=\"2159\">A and B can do a job in 5 days. B and C can do it in 6 days. A and C can do it in 7.5 days. How long will A, B, and C take together?<br data-start=\"1845\" data-end=\"1848\" \/><strong data-start=\"1848\" data-end=\"1859\">Answer:<\/strong><br data-start=\"1859\" data-end=\"1862\" \/><span class=\"katex\"><span class=\"katex-mathml\">15+16+17.5=2(A+B+C)\\frac{1}{5}+\\frac{1}{6}+\\frac{1}{7.5}=2(A+B+C)<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">5<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">1<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><span class=\"mbin\">+<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">6<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">1<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><span class=\"mbin\">+<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">7.5<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">1<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">2<\/span><span class=\"mopen\">(<\/span><span class=\"mord mathnormal\">A<\/span><span class=\"mbin\">+<\/span><\/span><span class=\"base\"><span class=\"mord mathnormal\">B<\/span><span class=\"mbin\">+<\/span><\/span><span class=\"base\"><span class=\"mord mathnormal\">C<\/span><span class=\"mclose\">)<\/span><\/span><\/span><\/span> rate.<br data-start=\"1918\" data-end=\"1921\" \/>Compute: <span class=\"katex\"><span class=\"katex-mathml\">15=630\\frac{1}{5}=\\frac{6}{30}<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">5<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">1<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">30<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">6<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span>, <span class=\"katex\"><span class=\"katex-mathml\">16=530\\frac{1}{6}=\\frac{5}{30}<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">6<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">1<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">30<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">5<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span>, <span class=\"katex\"><span class=\"katex-mathml\">17.5=17.5=215=430\\frac{1}{7.5}=\\frac{1}{7.5}=\\frac{2}{15}=\\frac{4}{30}<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">7.5<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">1<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">7.5<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">1<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">15<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">2<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">30<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">4<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span>. Sum <span class=\"katex\"><span class=\"katex-mathml\">=1530=12=\\frac{15}{30}=\\frac{1}{2}<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">30<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">15<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">2<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">1<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span>.<br data-start=\"2084\" data-end=\"2087\" \/>So <span class=\"katex\"><span class=\"katex-mathml\">2(A+B+C)=122(A+B+C)=\\frac{1}{2}<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mord\">2<\/span><span class=\"mopen\">(<\/span><span class=\"mord mathnormal\">A<\/span><span class=\"mbin\">+<\/span><\/span><span class=\"base\"><span class=\"mord mathnormal\">B<\/span><span class=\"mbin\">+<\/span><\/span><span class=\"base\"><span class=\"mord mathnormal\">C<\/span><span class=\"mclose\">)<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">2<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">1<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span> \u21d2 <span class=\"katex\"><span class=\"katex-mathml\">A+B+C=14A+B+C=\\frac{1}{4}<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mord mathnormal\">A<\/span><span class=\"mbin\">+<\/span><\/span><span class=\"base\"><span class=\"mord mathnormal\">B<\/span><span class=\"mbin\">+<\/span><\/span><span class=\"base\"><span class=\"mord mathnormal\">C<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">4<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">1<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span>.<br data-start=\"2139\" data-end=\"2142\" \/>Time <span class=\"katex\"><span class=\"katex-mathml\">=4=4<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">4<\/span><\/span><\/span><\/span> days.<\/p>\n<\/li>\n<\/ol>\n<hr data-start=\"2161\" data-end=\"2164\" \/>\n<h2 data-start=\"2166\" data-end=\"2216\">Problem Set 3: Partial Work \/ Switching Workers<\/h2>\n<ol start=\"11\" data-start=\"2218\" data-end=\"3720\">\n<li data-start=\"2218\" data-end=\"2450\">\n<p data-start=\"2222\" data-end=\"2450\">A can finish a job in 16 days. A works for 6 days, then B finishes the remaining work in 5 days. How long would B take alone?<br data-start=\"2347\" data-end=\"2350\" \/><strong data-start=\"2350\" data-end=\"2361\">Answer:<\/strong> A work <span class=\"katex\"><span class=\"katex-mathml\">=6\/16=3\/8=6\/16=3\/8<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">6\/16<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">3\/8<\/span><\/span><\/span><\/span>. Remaining <span class=\"katex\"><span class=\"katex-mathml\">=5\/8=5\/8<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">5\/8<\/span><\/span><\/span><\/span>.<br data-start=\"2403\" data-end=\"2406\" \/>B rate <span class=\"katex\"><span class=\"katex-mathml\">=(5\/8)\/5=1\/8=(5\/8)\/5=1\/8<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mopen\">(<\/span><span class=\"mord\">5\/8<\/span><span class=\"mclose\">)<\/span><span class=\"mord\">\/5<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">1\/8<\/span><\/span><\/span><\/span> \u21d2 B time <span class=\"katex\"><span class=\"katex-mathml\">=8=8<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">8<\/span><\/span><\/span><\/span> days<\/p>\n<\/li>\n<li data-start=\"2452\" data-end=\"2858\">\n<p data-start=\"2456\" data-end=\"2858\">A can do a job in 12 days and B can do it in 18 days. They work together for 4 days, then A leaves. How many more days will B need to finish?<br data-start=\"2597\" data-end=\"2600\" \/><strong data-start=\"2600\" data-end=\"2611\">Answer:<\/strong> Together rate <span class=\"katex\"><span class=\"katex-mathml\">=112+118=536=\\frac{1}{12}+\\frac{1}{18}=\\frac{5}{36}<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">12<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">1<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><span class=\"mbin\">+<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">18<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">1<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">36<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">5<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span>.<br data-start=\"2670\" data-end=\"2673\" \/>Work in 4 days <span class=\"katex\"><span class=\"katex-mathml\">=4\u00d7536=2036=59=4 \\times \\frac{5}{36}=\\frac{20}{36}=\\frac{5}{9}<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">4<\/span><span class=\"mbin\">\u00d7<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">36<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">5<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">36<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">20<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">9<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">5<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span>. Remaining <span class=\"katex\"><span class=\"katex-mathml\">=1\u221259=49=1-\\frac{5}{9}=\\frac{4}{9}<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">1<\/span><span class=\"mbin\">\u2212<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">9<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">5<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">9<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">4<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span>.<br data-start=\"2783\" data-end=\"2786\" \/>B rate <span class=\"katex\"><span class=\"katex-mathml\">=118=\\frac{1}{18}<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">18<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">1<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span>. Time <span class=\"katex\"><span class=\"katex-mathml\">=(4\/9)\/(1\/18)=(4\/9)\u00d718=8=(4\/9)\/ (1\/18)= (4\/9)\\times 18=8<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mopen\">(<\/span><span class=\"mord\">4\/9<\/span><span class=\"mclose\">)<\/span><span class=\"mord\">\/<\/span><span class=\"mopen\">(<\/span><span class=\"mord\">1\/18<\/span><span class=\"mclose\">)<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mopen\">(<\/span><span class=\"mord\">4\/9<\/span><span class=\"mclose\">)<\/span><span class=\"mbin\">\u00d7<\/span><\/span><span class=\"base\"><span class=\"mord\">18<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">8<\/span><\/span><\/span><\/span> days<\/p>\n<\/li>\n<li data-start=\"2860\" data-end=\"3137\">\n<p data-start=\"2864\" data-end=\"3137\">A completes <span class=\"katex\"><span class=\"katex-mathml\">14\\frac{1}{4}<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">4<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">1<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span> of a job in 3 days. B completes <span class=\"katex\"><span class=\"katex-mathml\">13\\frac{1}{3}<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mord\"><span class=\"mfrac\"><span class=\"vlist-t vlist-t2\"><span class=\"vlist-r\"><span class=\"vlist\"><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">3<\/span><\/span><span class=\"sizing reset-size6 size3 mtight\"><span class=\"mord mtight\">1<\/span><\/span><\/span><span class=\"vlist-s\">\u200b<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span> of the same job in 4 days. How long will they take together to finish the whole job?<br data-start=\"3028\" data-end=\"3031\" \/><strong data-start=\"3031\" data-end=\"3042\">Answer:<\/strong> A rate <span class=\"katex\"><span class=\"katex-mathml\">=(1\/4)\/3=1\/12=(1\/4)\/3=1\/12<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mopen\">(<\/span><span class=\"mord\">1\/4<\/span><span class=\"mclose\">)<\/span><span class=\"mord\">\/3<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">1\/12<\/span><\/span><\/span><\/span>. B rate <span class=\"katex\"><span class=\"katex-mathml\">=(1\/3)\/4=1\/12=(1\/3)\/4=1\/12<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mopen\">(<\/span><span class=\"mord\">1\/3<\/span><span class=\"mclose\">)<\/span><span class=\"mord\">\/4<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">1\/12<\/span><\/span><\/span><\/span>.<br data-start=\"3094\" data-end=\"3097\" \/>Together rate <span class=\"katex\"><span class=\"katex-mathml\">=1\/6=1\/6<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">1\/6<\/span><\/span><\/span><\/span>. Time <span class=\"katex\"><span class=\"katex-mathml\">=6=6<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">6<\/span><\/span><\/span><\/span> days<\/p>\n<\/li>\n<li data-start=\"3139\" data-end=\"3474\">\n<p data-start=\"3143\" data-end=\"3474\">A can finish a job in 10 days. B can finish it in 15 days. A works alone for 2 days, then A and B work together. Total time to finish?<br data-start=\"3277\" data-end=\"3280\" \/><strong data-start=\"3280\" data-end=\"3291\">Answer:<\/strong> A work in 2 days <span class=\"katex\"><span class=\"katex-mathml\">=2\/10=1\/5=2\/10=1\/5<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">2\/10<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">1\/5<\/span><\/span><\/span><\/span>. Remaining <span class=\"katex\"><span class=\"katex-mathml\">=4\/5=4\/5<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">4\/5<\/span><\/span><\/span><\/span>.<br data-start=\"3343\" data-end=\"3346\" \/>Together rate <span class=\"katex\"><span class=\"katex-mathml\">=1\/10+1\/15=1\/6=1\/10+1\/15=1\/6<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">1\/10<\/span><span class=\"mbin\">+<\/span><\/span><span class=\"base\"><span class=\"mord\">1\/15<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">1\/6<\/span><\/span><\/span><\/span>.<br data-start=\"3379\" data-end=\"3382\" \/>Time for remaining <span class=\"katex\"><span class=\"katex-mathml\">=(4\/5)\/(1\/6)=(4\/5)\u00d76=24\/5=4.8=(4\/5)\/(1\/6)= (4\/5)\\times 6=24\/5=4.8<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mopen\">(<\/span><span class=\"mord\">4\/5<\/span><span class=\"mclose\">)<\/span><span class=\"mord\">\/<\/span><span class=\"mopen\">(<\/span><span class=\"mord\">1\/6<\/span><span class=\"mclose\">)<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mopen\">(<\/span><span class=\"mord\">4\/5<\/span><span class=\"mclose\">)<\/span><span class=\"mbin\">\u00d7<\/span><\/span><span class=\"base\"><span class=\"mord\">6<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">24\/5<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">4.8<\/span><\/span><\/span><\/span> days<br data-start=\"3446\" data-end=\"3449\" \/>Total <span class=\"katex\"><span class=\"katex-mathml\">=2+4.8=6.8=2+4.8=6.8<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">2<\/span><span class=\"mbin\">+<\/span><\/span><span class=\"base\"><span class=\"mord\">4.8<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">6.8<\/span><\/span><\/span><\/span> days<\/p>\n<\/li>\n<li data-start=\"3476\" data-end=\"3720\">\n<p data-start=\"3480\" data-end=\"3720\">A and B together can finish a job in 8 days. A alone can finish it in 12 days. If they work together for 3 days then stop, how much work remains?<br data-start=\"3625\" data-end=\"3628\" \/><strong data-start=\"3628\" data-end=\"3639\">Answer:<\/strong> Together rate <span class=\"katex\"><span class=\"katex-mathml\">=1\/8=1\/8<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">1\/8<\/span><\/span><\/span><\/span>. Work done in 3 days <span class=\"katex\"><span class=\"katex-mathml\">=3\/8=3\/8<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">3\/8<\/span><\/span><\/span><\/span>.<br data-start=\"3693\" data-end=\"3696\" \/>Remaining <span class=\"katex\"><span class=\"katex-mathml\">=1\u22123\/8=5\/8=1-3\/8=5\/8<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">1<\/span><span class=\"mbin\">\u2212<\/span><\/span><span class=\"base\"><span class=\"mord\">3\/8<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">5\/8<\/span><\/span><\/span><\/span><\/p>\n<\/li>\n<\/ol>\n<hr data-start=\"3722\" data-end=\"3725\" \/>\n<h2 data-start=\"3727\" data-end=\"3767\">Problem Set 4: Efficiency Comparisons<\/h2>\n<ol start=\"16\" data-start=\"3769\" data-end=\"4601\">\n<li data-start=\"3769\" data-end=\"3918\">\n<p data-start=\"3773\" data-end=\"3918\">A can do a job in 14 days. B is 40% faster than A. How many days will B take?<br data-start=\"3850\" data-end=\"3853\" \/><strong data-start=\"3853\" data-end=\"3864\">Answer:<\/strong> B rate <span class=\"katex\"><span class=\"katex-mathml\">=1.4\u00d7(1\/14)=1\/10=1.4 \\times (1\/14)=1\/10<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">1.4<\/span><span class=\"mbin\">\u00d7<\/span><\/span><span class=\"base\"><span class=\"mopen\">(<\/span><span class=\"mord\">1\/14<\/span><span class=\"mclose\">)<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">1\/10<\/span><\/span><\/span><\/span>. Time <span class=\"katex\"><span class=\"katex-mathml\">=10=10<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">10<\/span><\/span><\/span><\/span> days<\/p>\n<\/li>\n<li data-start=\"3920\" data-end=\"4045\">\n<p data-start=\"3924\" data-end=\"4045\">A can do a job in 20 days. B takes 25% more time than A. How long will B take?<br data-start=\"4002\" data-end=\"4005\" \/><strong data-start=\"4005\" data-end=\"4016\">Answer:<\/strong> <span class=\"katex\"><span class=\"katex-mathml\">20\u00d71.25=2520 \\times 1.25 = 25<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mord\">20<\/span><span class=\"mbin\">\u00d7<\/span><\/span><span class=\"base\"><span class=\"mord\">1.25<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">25<\/span><\/span><\/span><\/span> days<\/p>\n<\/li>\n<li data-start=\"4047\" data-end=\"4194\">\n<p data-start=\"4051\" data-end=\"4194\">A is twice as efficient as B. If A finishes a job in 9 days, how long will B take?<br data-start=\"4133\" data-end=\"4136\" \/><strong data-start=\"4136\" data-end=\"4147\">Answer:<\/strong> B is half as fast \u21d2 time doubles \u21d2 <span class=\"katex\"><span class=\"katex-mathml\">1818<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mord\">18<\/span><\/span><\/span><\/span> days<\/p>\n<\/li>\n<li data-start=\"4196\" data-end=\"4443\">\n<p data-start=\"4200\" data-end=\"4443\">A and B together finish a job in 6 days. A is 50% more efficient than B. How long will A take alone?<br data-start=\"4300\" data-end=\"4303\" \/><strong data-start=\"4303\" data-end=\"4314\">Answer:<\/strong> Let B rate <span class=\"katex\"><span class=\"katex-mathml\">=x=x<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord mathnormal\">x<\/span><\/span><\/span><\/span>. A rate <span class=\"katex\"><span class=\"katex-mathml\">=1.5x=1.5x<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">1.5<\/span><span class=\"mord mathnormal\">x<\/span><\/span><\/span><\/span>.<br data-start=\"4351\" data-end=\"4354\" \/>Together rate <span class=\"katex\"><span class=\"katex-mathml\">=2.5x=1\/6=2.5x=1\/6<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">2.5<\/span><span class=\"mord mathnormal\">x<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">1\/6<\/span><\/span><\/span><\/span> \u21d2 <span class=\"katex\"><span class=\"katex-mathml\">x=1\/15x=1\/15<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mord mathnormal\">x<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">1\/15<\/span><\/span><\/span><\/span>.<br data-start=\"4395\" data-end=\"4398\" \/>A rate <span class=\"katex\"><span class=\"katex-mathml\">=1.5\/15=1\/10=1.5\/15=1\/10<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">1.5\/15<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">1\/10<\/span><\/span><\/span><\/span> \u21d2 A time <span class=\"katex\"><span class=\"katex-mathml\">=10=10<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">10<\/span><\/span><\/span><\/span> days<\/p>\n<\/li>\n<li data-start=\"4445\" data-end=\"4601\">\n<p data-start=\"4449\" data-end=\"4601\">A can finish a job in 12 days. B is 20% less efficient than A. How long will B take?<br data-start=\"4533\" data-end=\"4536\" \/><strong data-start=\"4536\" data-end=\"4547\">Answer:<\/strong> B rate <span class=\"katex\"><span class=\"katex-mathml\">=0.8\u00d7(1\/12)=1\/15=0.8 \\times (1\/12)=1\/15<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">0.8<\/span><span class=\"mbin\">\u00d7<\/span><\/span><span class=\"base\"><span class=\"mopen\">(<\/span><span class=\"mord\">1\/12<\/span><span class=\"mclose\">)<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">1\/15<\/span><\/span><\/span><\/span>. Time <span class=\"katex\"><span class=\"katex-mathml\">=15=15<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">15<\/span><\/span><\/span><\/span> days<\/p>\n<\/li>\n<\/ol>\n<hr data-start=\"4603\" data-end=\"4606\" \/>\n<h2 data-start=\"4608\" data-end=\"4661\">Problem Set 5: Pipes and Cisterns (Work With Loss)<\/h2>\n<ol start=\"21\" data-start=\"4663\" data-end=\"5864\">\n<li data-start=\"4663\" data-end=\"4845\">\n<p data-start=\"4667\" data-end=\"4845\">A pipe fills a tank in 6 hours. Another fills it in 8 hours. How long to fill if both are opened together?<br data-start=\"4773\" data-end=\"4776\" \/><strong data-start=\"4776\" data-end=\"4787\">Answer:<\/strong> Rate <span class=\"katex\"><span class=\"katex-mathml\">=1\/6+1\/8=7\/24=1\/6+1\/8=7\/24<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">1\/6<\/span><span class=\"mbin\">+<\/span><\/span><span class=\"base\"><span class=\"mord\">1\/8<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">7\/24<\/span><\/span><\/span><\/span>. Time <span class=\"katex\"><span class=\"katex-mathml\">=24\/7\u22483.43=24\/7 \\approx 3.43<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">24\/7<\/span><span class=\"mrel\">\u2248<\/span><\/span><span class=\"base\"><span class=\"mord\">3.43<\/span><\/span><\/span><\/span> hours<\/p>\n<\/li>\n<li data-start=\"4847\" data-end=\"5010\">\n<p data-start=\"4851\" data-end=\"5010\">A pipe fills a tank in 10 hours. A leak empties it in 15 hours. How long to fill with both open?<br data-start=\"4947\" data-end=\"4950\" \/><strong data-start=\"4950\" data-end=\"4961\">Answer:<\/strong> Net rate <span class=\"katex\"><span class=\"katex-mathml\">=1\/10\u22121\/15=1\/30=1\/10-1\/15=1\/30<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">1\/10<\/span><span class=\"mbin\">\u2212<\/span><\/span><span class=\"base\"><span class=\"mord\">1\/15<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">1\/30<\/span><\/span><\/span><\/span>. Time <span class=\"katex\"><span class=\"katex-mathml\">=30=30<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">30<\/span><\/span><\/span><\/span> hours<\/p>\n<\/li>\n<li data-start=\"5012\" data-end=\"5238\">\n<p data-start=\"5016\" data-end=\"5238\">Two pipes can fill a tank in 12 hours and 18 hours. A drain can empty it in 9 hours. If all are opened, what happens?<br data-start=\"5133\" data-end=\"5136\" \/><strong data-start=\"5136\" data-end=\"5147\">Answer:<\/strong> Net rate <span class=\"katex\"><span class=\"katex-mathml\">=1\/12+1\/18\u22121\/9=3\/36+2\/36\u22124\/36=1\/36=1\/12+1\/18-1\/9 = 3\/36+2\/36-4\/36=1\/36<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">1\/12<\/span><span class=\"mbin\">+<\/span><\/span><span class=\"base\"><span class=\"mord\">1\/18<\/span><span class=\"mbin\">\u2212<\/span><\/span><span class=\"base\"><span class=\"mord\">1\/9<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">3\/36<\/span><span class=\"mbin\">+<\/span><\/span><span class=\"base\"><span class=\"mord\">2\/36<\/span><span class=\"mbin\">\u2212<\/span><\/span><span class=\"base\"><span class=\"mord\">4\/36<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">1\/36<\/span><\/span><\/span><\/span>.<br data-start=\"5198\" data-end=\"5201\" \/>Tank will still fill in <strong data-start=\"5225\" data-end=\"5237\">36 hours<\/strong>.<\/p>\n<\/li>\n<li data-start=\"5240\" data-end=\"5548\">\n<p data-start=\"5244\" data-end=\"5548\">A pipe fills a tank in 5 hours. After 2 hours, a leak opens that can empty the full tank in 10 hours. How long total to fill?<br data-start=\"5369\" data-end=\"5372\" \/><strong data-start=\"5372\" data-end=\"5383\">Answer:<\/strong><br data-start=\"5383\" data-end=\"5386\" \/>First 2 hours work <span class=\"katex\"><span class=\"katex-mathml\">=2\/5=2\/5<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">2\/5<\/span><\/span><\/span><\/span>. Remaining <span class=\"katex\"><span class=\"katex-mathml\">=3\/5=3\/5<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">3\/5<\/span><\/span><\/span><\/span>.<br data-start=\"5434\" data-end=\"5437\" \/>Net rate after leak <span class=\"katex\"><span class=\"katex-mathml\">=1\/5\u22121\/10=1\/10=1\/5-1\/10=1\/10<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">1\/5<\/span><span class=\"mbin\">\u2212<\/span><\/span><span class=\"base\"><span class=\"mord\">1\/10<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">1\/10<\/span><\/span><\/span><\/span>.<br data-start=\"5476\" data-end=\"5479\" \/>Time for remaining <span class=\"katex\"><span class=\"katex-mathml\">=(3\/5)\/(1\/10)=6=(3\/5)\/(1\/10)=6<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mopen\">(<\/span><span class=\"mord\">3\/5<\/span><span class=\"mclose\">)<\/span><span class=\"mord\">\/<\/span><span class=\"mopen\">(<\/span><span class=\"mord\">1\/10<\/span><span class=\"mclose\">)<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">6<\/span><\/span><\/span><\/span> hours<br data-start=\"5523\" data-end=\"5526\" \/>Total <span class=\"katex\"><span class=\"katex-mathml\">=2+6=8=2+6=8<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">2<\/span><span class=\"mbin\">+<\/span><\/span><span class=\"base\"><span class=\"mord\">6<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">8<\/span><\/span><\/span><\/span> hours<\/p>\n<\/li>\n<li data-start=\"5550\" data-end=\"5864\">\n<p data-start=\"5554\" data-end=\"5864\">A pipe fills in 9 hours. A drain empties in 12 hours. Both opened for 6 hours, then drain closed. How much more time to fill?<br data-start=\"5679\" data-end=\"5682\" \/><strong data-start=\"5682\" data-end=\"5693\">Answer:<\/strong> Net rate first <span class=\"katex\"><span class=\"katex-mathml\">=1\/9\u22121\/12=1\/36=1\/9-1\/12=1\/36<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">1\/9<\/span><span class=\"mbin\">\u2212<\/span><\/span><span class=\"base\"><span class=\"mord\">1\/12<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">1\/36<\/span><\/span><\/span><\/span>. Work done in 6 hours <span class=\"katex\"><span class=\"katex-mathml\">=6\/36=1\/6=6\/36=1\/6<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">6\/36<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">1\/6<\/span><\/span><\/span><\/span>.<br data-start=\"5764\" data-end=\"5767\" \/>Remaining <span class=\"katex\"><span class=\"katex-mathml\">=5\/6=5\/6<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">5\/6<\/span><\/span><\/span><\/span>. Filling rate alone <span class=\"katex\"><span class=\"katex-mathml\">=1\/9=1\/9<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">1\/9<\/span><\/span><\/span><\/span>.<br data-start=\"5815\" data-end=\"5818\" \/>Time <span class=\"katex\"><span class=\"katex-mathml\">=(5\/6)\/(1\/9)=(5\/6)\u00d79=7.5=(5\/6)\/(1\/9)= (5\/6)\\times 9=7.5<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mopen\">(<\/span><span class=\"mord\">5\/6<\/span><span class=\"mclose\">)<\/span><span class=\"mord\">\/<\/span><span class=\"mopen\">(<\/span><span class=\"mord\">1\/9<\/span><span class=\"mclose\">)<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mopen\">(<\/span><span class=\"mord\">5\/6<\/span><span class=\"mclose\">)<\/span><span class=\"mbin\">\u00d7<\/span><\/span><span class=\"base\"><span class=\"mord\">9<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">7.5<\/span><\/span><\/span><\/span> hours<\/p>\n<\/li>\n<\/ol>\n<hr data-start=\"5866\" data-end=\"5869\" \/>\n<h2 data-start=\"5871\" data-end=\"5903\">Problem Set 6: Work and Wages<\/h2>\n<ol start=\"26\" data-start=\"5905\" data-end=\"6895\">\n<li data-start=\"5905\" data-end=\"6128\">\n<p data-start=\"5909\" data-end=\"6128\">A and B earn \u20b11,800 for completing a job. A can do it in 12 days and B in 18 days. Divide the wages fairly.<br data-start=\"6016\" data-end=\"6019\" \/><strong data-start=\"6019\" data-end=\"6030\">Answer:<\/strong> Work ratio <span class=\"katex\"><span class=\"katex-mathml\">=(1\/12):(1\/18)=3:2=(1\/12):(1\/18)=3:2<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mopen\">(<\/span><span class=\"mord\">1\/12<\/span><span class=\"mclose\">)<\/span><span class=\"mrel\">:<\/span><\/span><span class=\"base\"><span class=\"mopen\">(<\/span><span class=\"mord\">1\/18<\/span><span class=\"mclose\">)<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">3<\/span><span class=\"mrel\">:<\/span><\/span><span class=\"base\"><span class=\"mord\">2<\/span><\/span><\/span><\/span>.<br data-start=\"6065\" data-end=\"6068\" \/>A = <span class=\"katex\"><span class=\"katex-mathml\">3\/5\u00d71800=\u20b11,0803\/5 \\times 1800=\u20b11,080<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mord\">3\/5<\/span><span class=\"mbin\">\u00d7<\/span><\/span><span class=\"base\"><span class=\"mord\">1800<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">\u20b11<\/span><span class=\"mpunct\">,<\/span><span class=\"mord\">080<\/span><\/span><\/span><\/span>, B = <span class=\"katex\"><span class=\"katex-mathml\">2\/5\u00d71800=\u20b17202\/5 \\times 1800=\u20b1720<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mord\">2\/5<\/span><span class=\"mbin\">\u00d7<\/span><\/span><span class=\"base\"><span class=\"mord\">1800<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">\u20b1720<\/span><\/span><\/span><\/span><\/p>\n<\/li>\n<li data-start=\"6130\" data-end=\"6316\">\n<p data-start=\"6134\" data-end=\"6316\">A, B, and C complete a job and earn \u20b13,600. Their daily work rates are in the ratio 2:3:5. How much does C receive?<br data-start=\"6249\" data-end=\"6252\" \/><strong data-start=\"6252\" data-end=\"6263\">Answer:<\/strong> C share <span class=\"katex\"><span class=\"katex-mathml\">=5\/(2+3+5)=5\/10=1\/2=5\/(2+3+5)=5\/10=1\/2<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">5\/<\/span><span class=\"mopen\">(<\/span><span class=\"mord\">2<\/span><span class=\"mbin\">+<\/span><\/span><span class=\"base\"><span class=\"mord\">3<\/span><span class=\"mbin\">+<\/span><\/span><span class=\"base\"><span class=\"mord\">5<\/span><span class=\"mclose\">)<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">5\/10<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">1\/2<\/span><\/span><\/span><\/span>.<br data-start=\"6296\" data-end=\"6299\" \/>C gets <strong data-start=\"6306\" data-end=\"6316\">\u20b11,800<\/strong><\/p>\n<\/li>\n<li data-start=\"6318\" data-end=\"6508\">\n<p data-start=\"6322\" data-end=\"6508\">A and B work together for 6 days and earn \u20b12,700. If A is twice as efficient as B, how much does A get?<br data-start=\"6425\" data-end=\"6428\" \/><strong data-start=\"6428\" data-end=\"6439\">Answer:<\/strong> Work ratio A:B = 2:1.<br data-start=\"6461\" data-end=\"6464\" \/>A = <span class=\"katex\"><span class=\"katex-mathml\">2\/3\u00d72700=\u20b11,8002\/3 \\times 2700=\u20b11,800<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mord\">2\/3<\/span><span class=\"mbin\">\u00d7<\/span><\/span><span class=\"base\"><span class=\"mord\">2700<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">\u20b11<\/span><span class=\"mpunct\">,<\/span><span class=\"mord\">800<\/span><\/span><\/span><\/span>, B = <span class=\"katex\"><span class=\"katex-mathml\">\u20b1900\u20b1900<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mord\">\u20b1900<\/span><\/span><\/span><\/span><\/p>\n<\/li>\n<li data-start=\"6510\" data-end=\"6725\">\n<p data-start=\"6514\" data-end=\"6725\">A alone can finish in 16 days, B alone in 24 days. They earn \u20b14,000 working together. How much more does A earn than B?<br data-start=\"6633\" data-end=\"6636\" \/><strong data-start=\"6636\" data-end=\"6647\">Answer:<\/strong> Ratio <span class=\"katex\"><span class=\"katex-mathml\">=(1\/16):(1\/24)=3:2=(1\/16):(1\/24)=3:2<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mopen\">(<\/span><span class=\"mord\">1\/16<\/span><span class=\"mclose\">)<\/span><span class=\"mrel\">:<\/span><\/span><span class=\"base\"><span class=\"mopen\">(<\/span><span class=\"mord\">1\/24<\/span><span class=\"mclose\">)<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">3<\/span><span class=\"mrel\">:<\/span><\/span><span class=\"base\"><span class=\"mord\">2<\/span><\/span><\/span><\/span>.<br data-start=\"6677\" data-end=\"6680\" \/>A = \u20b12,400; B = \u20b11,600; Difference = <strong data-start=\"6717\" data-end=\"6725\">\u20b1800<\/strong><\/p>\n<\/li>\n<li data-start=\"6727\" data-end=\"6895\">\n<p data-start=\"6731\" data-end=\"6895\">A, B, and C earn \u20b15,000. A does 40% of the work, B does 35%, C does the rest. How much does C earn?<br data-start=\"6830\" data-end=\"6833\" \/><strong data-start=\"6833\" data-end=\"6844\">Answer:<\/strong> C work = 25% \u21d2 C earns <span class=\"katex\"><span class=\"katex-mathml\">0.25\u00d75000=\u20b11,2500.25 \\times 5000=\u20b11,250<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mord\">0.25<\/span><span class=\"mbin\">\u00d7<\/span><\/span><span class=\"base\"><span class=\"mord\">5000<\/span><span class=\"mrel\">=<\/span><\/span><span class=\"base\"><span class=\"mord\">\u20b11<\/span><span class=\"mpunct\">,<\/span><span class=\"mord\">250<\/span><\/span><\/span><\/span><\/p>\n<\/li>\n<\/ol>\n<blockquote class=\"wp-embedded-content\" data-secret=\"v7dqLWsx05\"><p><a href=\"https:\/\/3d-universal.com\/en\/civil-service-exam\">Civil Service Exam Philippines: Complete Preparation and Passing Guide<\/a><\/p><\/blockquote>\n<p><iframe loading=\"lazy\" class=\"wp-embedded-content\" sandbox=\"allow-scripts\" security=\"restricted\" style=\"position: absolute; visibility: hidden;\" title=\"&#8220;Civil Service Exam Philippines: Complete Preparation and Passing Guide&#8221; &#8212; Study English at 3D ACADEMY, a Language School in Cebu, Philippines\" src=\"https:\/\/3d-universal.com\/en\/civil-service-exam\/embed#?secret=afaV7OH9KN#?secret=v7dqLWsx05\" data-secret=\"v7dqLWsx05\" width=\"500\" height=\"282\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\"><\/iframe><\/p>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":19266,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_kad_blocks_custom_css":"","_kad_blocks_head_custom_js":"","_kad_blocks_body_custom_js":"","_kad_blocks_footer_custom_js":"","footnotes":""},"categories":[107],"tags":[],"class_list":["post-19263","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-civil-service-exam"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v25.6 (Yoast SEO v25.6) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Numerical Ability Work Problems Explained: Civil Service Exam Guide - Study English at 3D ACADEMY, a Language School in Cebu, Philippines<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/3d-universal.com\/en\/blogs\/numerical-ability-work-problems-explained.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Numerical Ability Work Problems Explained: Civil Service Exam Guide\" \/>\n<meta property=\"og:url\" content=\"https:\/\/3d-universal.com\/en\/blogs\/numerical-ability-work-problems-explained.html\" \/>\n<meta property=\"og:site_name\" content=\"Study English at 3D ACADEMY, a Language School in Cebu, Philippines\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/3dUniversalEnglish\" \/>\n<meta property=\"article:published_time\" content=\"2025-12-19T06:52:50+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-12-19T06:56:38+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/3d-universal.com\/en\/wp-content\/uploads\/2025\/12\/ChatGPT-Image-Dec-19-2025-02_56_12-PM.png\" \/>\n\t<meta property=\"og:image:width\" content=\"640\" \/>\n\t<meta property=\"og:image:height\" content=\"427\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"13 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/3d-universal.com\/en\/blogs\/numerical-ability-work-problems-explained.html#article\",\"isPartOf\":{\"@id\":\"https:\/\/3d-universal.com\/en\/blogs\/numerical-ability-work-problems-explained.html\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\/\/3d-universal.com\/en\/#\/schema\/person\/2b62992adaf063df95ddd762ad83b37d\"},\"headline\":\"Numerical Ability Work Problems Explained: Civil Service Exam Guide\",\"datePublished\":\"2025-12-19T06:52:50+00:00\",\"dateModified\":\"2025-12-19T06:56:38+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/3d-universal.com\/en\/blogs\/numerical-ability-work-problems-explained.html\"},\"wordCount\":2037,\"publisher\":{\"@id\":\"https:\/\/3d-universal.com\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/3d-universal.com\/en\/blogs\/numerical-ability-work-problems-explained.html#primaryimage\"},\"thumbnailUrl\":\"https:\/\/3d-universal.com\/en\/wp-content\/uploads\/2025\/12\/ChatGPT-Image-Dec-19-2025-02_56_12-PM.png\",\"articleSection\":[\"Civil Service Exam\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/3d-universal.com\/en\/blogs\/numerical-ability-work-problems-explained.html\",\"url\":\"https:\/\/3d-universal.com\/en\/blogs\/numerical-ability-work-problems-explained.html\",\"name\":\"Numerical Ability Work Problems Explained: Civil Service Exam Guide - Study English at 3D ACADEMY, a Language School in Cebu, Philippines\",\"isPartOf\":{\"@id\":\"https:\/\/3d-universal.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/3d-universal.com\/en\/blogs\/numerical-ability-work-problems-explained.html#primaryimage\"},\"image\":{\"@id\":\"https:\/\/3d-universal.com\/en\/blogs\/numerical-ability-work-problems-explained.html#primaryimage\"},\"thumbnailUrl\":\"https:\/\/3d-universal.com\/en\/wp-content\/uploads\/2025\/12\/ChatGPT-Image-Dec-19-2025-02_56_12-PM.png\",\"datePublished\":\"2025-12-19T06:52:50+00:00\",\"dateModified\":\"2025-12-19T06:56:38+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/3d-universal.com\/en\/blogs\/numerical-ability-work-problems-explained.html#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/3d-universal.com\/en\/blogs\/numerical-ability-work-problems-explained.html\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/3d-universal.com\/en\/blogs\/numerical-ability-work-problems-explained.html#primaryimage\",\"url\":\"https:\/\/3d-universal.com\/en\/wp-content\/uploads\/2025\/12\/ChatGPT-Image-Dec-19-2025-02_56_12-PM.png\",\"contentUrl\":\"https:\/\/3d-universal.com\/en\/wp-content\/uploads\/2025\/12\/ChatGPT-Image-Dec-19-2025-02_56_12-PM.png\",\"width\":640,\"height\":427},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/3d-universal.com\/en\/blogs\/numerical-ability-work-problems-explained.html#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/3d-universal.com\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Numerical Ability Work Problems Explained: Civil Service Exam Guide\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/3d-universal.com\/en\/#website\",\"url\":\"https:\/\/3d-universal.com\/en\/\",\"name\":\"3D ACADEMY Philippines English School in Cebu\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/3d-universal.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/3d-universal.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/3d-universal.com\/en\/#organization\",\"name\":\"3D ACADEMY Philippines English School in Cebu\",\"url\":\"https:\/\/3d-universal.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/3d-universal.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/3d-universal.com\/en\/wp-content\/uploads\/2025\/06\/3d-new-logo.jpg\",\"contentUrl\":\"https:\/\/3d-universal.com\/en\/wp-content\/uploads\/2025\/06\/3d-new-logo.jpg\",\"width\":842,\"height\":932,\"caption\":\"3D ACADEMY Philippines English School in Cebu\"},\"image\":{\"@id\":\"https:\/\/3d-universal.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/3dUniversalEnglish\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/3d-universal.com\/en\/#\/schema\/person\/2b62992adaf063df95ddd762ad83b37d\",\"name\":\"admin\",\"url\":\"https:\/\/3d-universal.com\/en\/blogs\/author\/admin\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Numerical Ability Work Problems Explained: Civil Service Exam Guide - Study English at 3D ACADEMY, a Language School in Cebu, Philippines","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/3d-universal.com\/en\/blogs\/numerical-ability-work-problems-explained.html","og_locale":"en_US","og_type":"article","og_title":"Numerical Ability Work Problems Explained: Civil Service Exam Guide","og_url":"https:\/\/3d-universal.com\/en\/blogs\/numerical-ability-work-problems-explained.html","og_site_name":"Study English at 3D ACADEMY, a Language School in Cebu, Philippines","article_publisher":"https:\/\/www.facebook.com\/3dUniversalEnglish","article_published_time":"2025-12-19T06:52:50+00:00","article_modified_time":"2025-12-19T06:56:38+00:00","og_image":[{"width":640,"height":427,"url":"https:\/\/3d-universal.com\/en\/wp-content\/uploads\/2025\/12\/ChatGPT-Image-Dec-19-2025-02_56_12-PM.png","type":"image\/png"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"13 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/3d-universal.com\/en\/blogs\/numerical-ability-work-problems-explained.html#article","isPartOf":{"@id":"https:\/\/3d-universal.com\/en\/blogs\/numerical-ability-work-problems-explained.html"},"author":{"name":"admin","@id":"https:\/\/3d-universal.com\/en\/#\/schema\/person\/2b62992adaf063df95ddd762ad83b37d"},"headline":"Numerical Ability Work Problems Explained: Civil Service Exam Guide","datePublished":"2025-12-19T06:52:50+00:00","dateModified":"2025-12-19T06:56:38+00:00","mainEntityOfPage":{"@id":"https:\/\/3d-universal.com\/en\/blogs\/numerical-ability-work-problems-explained.html"},"wordCount":2037,"publisher":{"@id":"https:\/\/3d-universal.com\/en\/#organization"},"image":{"@id":"https:\/\/3d-universal.com\/en\/blogs\/numerical-ability-work-problems-explained.html#primaryimage"},"thumbnailUrl":"https:\/\/3d-universal.com\/en\/wp-content\/uploads\/2025\/12\/ChatGPT-Image-Dec-19-2025-02_56_12-PM.png","articleSection":["Civil Service Exam"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/3d-universal.com\/en\/blogs\/numerical-ability-work-problems-explained.html","url":"https:\/\/3d-universal.com\/en\/blogs\/numerical-ability-work-problems-explained.html","name":"Numerical Ability Work Problems Explained: Civil Service Exam Guide - Study English at 3D ACADEMY, a Language School in Cebu, Philippines","isPartOf":{"@id":"https:\/\/3d-universal.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/3d-universal.com\/en\/blogs\/numerical-ability-work-problems-explained.html#primaryimage"},"image":{"@id":"https:\/\/3d-universal.com\/en\/blogs\/numerical-ability-work-problems-explained.html#primaryimage"},"thumbnailUrl":"https:\/\/3d-universal.com\/en\/wp-content\/uploads\/2025\/12\/ChatGPT-Image-Dec-19-2025-02_56_12-PM.png","datePublished":"2025-12-19T06:52:50+00:00","dateModified":"2025-12-19T06:56:38+00:00","breadcrumb":{"@id":"https:\/\/3d-universal.com\/en\/blogs\/numerical-ability-work-problems-explained.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/3d-universal.com\/en\/blogs\/numerical-ability-work-problems-explained.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/3d-universal.com\/en\/blogs\/numerical-ability-work-problems-explained.html#primaryimage","url":"https:\/\/3d-universal.com\/en\/wp-content\/uploads\/2025\/12\/ChatGPT-Image-Dec-19-2025-02_56_12-PM.png","contentUrl":"https:\/\/3d-universal.com\/en\/wp-content\/uploads\/2025\/12\/ChatGPT-Image-Dec-19-2025-02_56_12-PM.png","width":640,"height":427},{"@type":"BreadcrumbList","@id":"https:\/\/3d-universal.com\/en\/blogs\/numerical-ability-work-problems-explained.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/3d-universal.com\/en"},{"@type":"ListItem","position":2,"name":"Numerical Ability Work Problems Explained: Civil Service Exam Guide"}]},{"@type":"WebSite","@id":"https:\/\/3d-universal.com\/en\/#website","url":"https:\/\/3d-universal.com\/en\/","name":"3D ACADEMY Philippines English School in Cebu","description":"","publisher":{"@id":"https:\/\/3d-universal.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/3d-universal.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/3d-universal.com\/en\/#organization","name":"3D ACADEMY Philippines English School in Cebu","url":"https:\/\/3d-universal.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/3d-universal.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/3d-universal.com\/en\/wp-content\/uploads\/2025\/06\/3d-new-logo.jpg","contentUrl":"https:\/\/3d-universal.com\/en\/wp-content\/uploads\/2025\/06\/3d-new-logo.jpg","width":842,"height":932,"caption":"3D ACADEMY Philippines English School in Cebu"},"image":{"@id":"https:\/\/3d-universal.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/3dUniversalEnglish"]},{"@type":"Person","@id":"https:\/\/3d-universal.com\/en\/#\/schema\/person\/2b62992adaf063df95ddd762ad83b37d","name":"admin","url":"https:\/\/3d-universal.com\/en\/blogs\/author\/admin"}]}},"taxonomy_info":{"category":[{"value":107,"label":"Civil Service Exam"}]},"featured_image_src_large":["https:\/\/3d-universal.com\/en\/wp-content\/uploads\/2025\/12\/ChatGPT-Image-Dec-19-2025-02_56_12-PM.png",640,427,false],"author_info":{"display_name":"admin","author_link":"https:\/\/3d-universal.com\/en\/blogs\/author\/admin"},"comment_info":0,"category_info":[{"term_id":107,"name":"Civil Service Exam","slug":"civil-service-exam","term_group":0,"term_taxonomy_id":107,"taxonomy":"category","description":"","parent":103,"count":140,"filter":"raw","term_order":"23","cat_ID":107,"category_count":140,"category_description":"","cat_name":"Civil Service Exam","category_nicename":"civil-service-exam","category_parent":103}],"tag_info":false,"_links":{"self":[{"href":"https:\/\/3d-universal.com\/en\/wp-json\/wp\/v2\/posts\/19263","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/3d-universal.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/3d-universal.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/3d-universal.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/3d-universal.com\/en\/wp-json\/wp\/v2\/comments?post=19263"}],"version-history":[{"count":3,"href":"https:\/\/3d-universal.com\/en\/wp-json\/wp\/v2\/posts\/19263\/revisions"}],"predecessor-version":[{"id":19267,"href":"https:\/\/3d-universal.com\/en\/wp-json\/wp\/v2\/posts\/19263\/revisions\/19267"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/3d-universal.com\/en\/wp-json\/wp\/v2\/media\/19266"}],"wp:attachment":[{"href":"https:\/\/3d-universal.com\/en\/wp-json\/wp\/v2\/media?parent=19263"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/3d-universal.com\/en\/wp-json\/wp\/v2\/categories?post=19263"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/3d-universal.com\/en\/wp-json\/wp\/v2\/tags?post=19263"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}